powered material handling | Strongarm
|
Strongarm Hoist
MaintenanceFor a moderately used machine, the following schedule should be carried out at a maximum 12-month interval:
|
||||
| Product Codes | |||||
|---|---|---|---|---|---|
| Strongarm Hoist | S4HW | ||||
|
The mast is fitted to the base plate with 2 pins. Remove the first pin and the mast can be folded down for easy travel - remove the second (pivot) pin, and the Strongarm can be stowed away. |
The slew gear and worm wheel are heavy duty to allow for 'out of line' effects if dragging loads into place. |
This is an integral piece of plant equipment. Used for lifting equipment from the ground floor to the second floor it effectively eliminates the need for a forklift, and stops people struggling up stairs with bulky or heavy equipment. |
Two lift positions for greater flexibility. Get that little extra bit of lift height by raising the boom (raise prior to lifting the load). |
As a safety precaution you can fold down the boom when you have finished. |
![]() |





